top of page
1%20Waste%20to%20Clean%20Energy%20Plant_
doosan lentjes.png.jpg

picture by

 
Face the 3 Biggest Profit Killers Now

by Doosan Lentjes

... and Grab more Green Profits with CBE than ever before.

Wasted Power: 66% of all Plants Underperform

1 Waste to Clean Energy Plant.jpg

Expect Results

increase fuel flexibility, boiler efficiency, load stability, stop heat /air /soot /smelting issues, boost ash quality 

Too many owners and operators give in to poor boiler efficiency and high internal per unit cost, wasting substantial bottom line. Not enough projects monitor and increase output while reducing costs and emissions. Very few re-invested into modernizing fuel, power, environmental equipment, and control systems.

We Optimize

Poor Recycling: Handsorting misses up to 85%

UniSort Film (2).jpg

Expect Results

turn disposal cost into recycling profits, learn in-house sorting, get suppliers or off-takers, produce high purity, clean recyclates to industry standard, export options

Too many operators think hand-sorting is cheap or good enough. But waste plants usually receive dirty material and rarely recover more than 20%. But they could easily achieve a 95% recovery rate with a few tweaks in process design, sensor-based technology & automation. However, separation at source is best.

  

We provide Solutions for

Our Services - Brownfield

Our Services - Greenfield

Assess Feasibility

Best Plant Design

Best Technology

Green Finance

Our Clients

Completed Projects

Get Started now

1 CBE References-min.jpg
WhatsApp Logo
bottom of page